When Nyfosa's head office was to be integrated with solar energy, we received the construction and planning challenge as a supplier.
As the facility at its highest point is at a height of 45 meters, careful planning was required from lifting of material by helicopter, to extra safety thinking around unloading areas and work environment. In addition, due to the wind exposure that occurs at high altitude, a specially manufactured mounting system with a separate construction statement was ordered to withstand the forces of the weather for a long time.
The plant's production is also real-time connected to the property's entrance where all visitors can see live how much is being produced right now, and how the total energy is converted into the number of electric car journeys, lighting, TV screens and much more. For Nyfosa, it was important to also have an educational element in connection with their order.
Summarized, the project contains
•High altitude installation (~45 m)
• Helicopter lift
• Custom-designed mounting system
• Safety features and digitalization technology