When Nyfosa's head office was to be integrated with solar energy, we were given the design and planning challenge as a supplier.
As the facility at its highest point is at an altitude of 45 metres, careful planning from lifting materials by helicopter, to extra safety thinking around unloading areas and working environment was required. In addition, due to the wind exposure that occurs at high altitude, custom-made assembly system was ordered with separate design statement to withstand the forces of the weather for a long time.
The plant's production is also real-time connected to the property's entrance where all visitors live can how much is produced right now, as well as how the combined energy is converted into the number of electric car rides, lighting, TV screen and much more. For Nyfosa it was important to also have an educational element in connection with his order.
Summary contains the project
•High altitude installation (~45 m)
•Helicopter lift
•Specially ordered assembly system
•Security features and digitisation technology